Al Dhafra PV2 Project

HV Connection

We are proud to announce the successful completion of a critical infrastructure project, connecting a primary substation to a solar park substation with the installation of 140,000 meters of high-voltage (33 kV) cable and fiber optic communication lines.

This project was executed with precision, efficiency, and adherence to the highest industry standards, ensuring seamless integration of renewable energy into the grid. 

The scope included:

High-Voltage Cable Installation – 140 km of 33 kV HV cable, designed for long-term durability and optimal performance.

Fiber Optic Network Deployment – Enabling secure, real-time data communication between the substations.

Safety & Quality Compliance – Strict adherence to safety protocols and quality control measures throughout the project lifecycle.

This achievement marks a significant step towards enhancing energy transmission efficiency and integrating renewable energy sources into the power network. Our team’s expertise, dedication, and seamless coordination were key factors in delivering this project on time and within budget.

Client Name

CMEC

Date

2021

Location

Al Dhafra Solar Park, Abu Dhabi, UAE