Primary Substation ADDC

33 kv, 22 kv & fibre optic installation

We are proud to have successfully completed key Medium Voltage (MV) and Fibre Optic Cable installation projects as part of Abu Dhabi Distribution Company (ADDC)’s network strengthening initiatives in the UAE. These projects play a crucial role in enhancing the reliability, capacity, and efficiency of the region’s power and telecommunications infrastructure.

Project Scope:

  • 220,000 meters of MV (33 kV) and fibre optic cable installation
  • 16,000 meters of MV (33 kV) and fibre optic cable installation
  • 52,000 meters of MV (22 kV) and fibre optic cable installation

As part of ADDC’s ongoing efforts to modernize and expand the electrical distribution network, these installations involved trenching, cable laying, jointing, testing, and commissioning to ensure seamless integration with the existing grid. The fibre optic infrastructure enhances communication and monitoring capabilities, contributing to a more resilient and future-ready power network.

With our expertise in power distribution and telecommunications, we remain committed to delivering high-quality engineering solutions that support the UAE’s vision for a robust and sustainable infrastructure.

Client Name

ADDC

Date

2024/2025

Location

Abu Dhabi